JOBS LIST
Cabin Job list
Updated 3/12/09
1. All Buildings should be checked yearly
1. Lights
2. Smoke alarms
3. Exit Signs
2. Cabin number 1
1. Paint porch floor and walls
2. Install larger rear exit door (36)
3. Cabin number 2
1. Install larger rear exit door (36)
4. Cabin number 3
1. Repair screen door
2. Replace rear steps
3. Paint porch, walls and floor
4. Install porch ceiling and paint
5. Install drop ceiling inside
6. Paint window trim
7. Replace middle rear foundation
5. Cabin number 4
1. Replace 48 florescent lights
2. Replace roof
3. Replace steps and paint
4. Remove stump
5. Replace porch floor and paint
6. Paint interior floor
7. Replace storm door
6. Cabin number 5
1. Replace 48 florescent lights
2. Install drop ceiling inside
3. Paint rear deck and steps
4. Paint railing, screen porch, enclosure bottom of the walls, porch ceilings and floor
5. Replace roof
7. Cabin number 6 (could be used for a sleeping cabin) (8)
1. Replace front step
2. Bring ramp to code (or remove)
3. Install drop ceiling
4. Clean roof
5. Painting throughout
8. Cabin number 7
1. Paint exterior, steps and porch
2. Repair lattice
3. Clean roof
4. Replace support under rear wall near steps
9. Cabin number 8
1. Paint front porch, floor, walls and front steps
10. Cabin number 9
1. Paint steps
2. Repair screens
3. Check Triplex
4. Repair lattice (4 off ground)
5. Brace screen door
6. Drop ceiling in cabin and porch
7. Paint
11. Cabin number 10
1. Install drop ceiling
2. Paint steps, platform on porch and rear steps
3. Finish railing on platform
4. New roof
12. Cabin number 11
1. Install new rear door (36)
2. Patch hole in wall
3. Repair screens
4. Paint porch floor and inside walls
5. Paint rear fascia
13. Cabin number 12
1. Install drop ceiling
2. Replace light fixtures
3. Paint inside walls
4. Enlarge back door (36)
14. Cabin number 13
1. Paint porch floor (Excellent shape)
15. Cabin number 14
1. Paint interior walls
2. Replace porch railings and paint
3. Remove stumps by cabin
16. Cabin number 15
1. Paint porch floor and interior walls
2. Paint rear steps and inside floor
17. Cabin number 16 (a sleeping cabin) (8)
1. Paint porch floor
2. Fascias and soffits
3. Paint front desk and railings
4. Add railing on inside of front steps
18. Cabin number 17 (a sleeping cabin) (8)
1. Install windows
2. Install outside walls
19. Cabin number 18 (a sleeping cabin) (8)
1. Paint front porch
2. Paint back steps
3. Paint railings on rear deck
4. Paint the interior
20. Cabin number 19 (a sleeping cabin) (8)
1. Paint front porch and steps (excellent shape)
21. Cabin number 20 (a sleeping cabin) (8)
1. Paint porch trim
2. Foundations post area tilting
3. Install outside lamp on post
4. If ramp stays; it needs to be brought up to code
22. Cabin number 22
1. Needs some landscaping
2. Install drop ceiling
3. Paint front and rear steps
23. Cabin number 23
1. Stain handicapped ramp
2. Paint railings
3. Paint porch floor
4. Paint front steps
24. Cabin number 24 and 25 (a sleeping cabin) (16) (Excellent shape)
1. Electric mast and guyed wire should be replaces
2. Needs outside light
25. Cabin number 26 and 27 (a sleeping cabin) (16)
1. Bathroom complete ceiling
2. Trim work in bathroom and hallway
3. Paint bathroom
26. Chapel
1. Needs landscaping in rear
2. Platform by rear door for handicapped exit
3. Spray or repair walkways
4. Install larger driveway
5. Pipe and stones
27. Drake house
1. Stain front porch
2. All outside needs painting (brown stable)
3. Change water supply to toilet
4. Remove rug (musty)
5. Landscaping
28. Hill house
1. Stain front porch
2. Need electric
3. Check-out landscaping
29. Infirmary
1. New roof
2. New window in two bathrooms
3. Finish trim in handicapped bathroom
4. Install railings on back steps
5. Install two vents in boiler and hot water room
6. Paint railing on ramp
7. Stain walk way on new ramp
8. Remove one bathroom in office (turn into a storage closet)
30. McCabe Office
1. Needs more insulation
2. Replace office window
3. Extend roof over porch
4. Enclose part of deck for sitting room
5. Stain the deck
31. Office containers
1. Install electric
2. Build shelves in containers
3. Paint brown (stable)
4. Possible build roof over containers
32. Shower Building
1. Laundry room
i. Paint lattice
ii. Repair and paint ceiling
2. Boys shower
i. New door on stall
ii. Install filter on water supply
3. Girls shower
i. Install filter on showers
ii. Paint grab bar in shower
4. Boiler room
i. Needs double fire wall
ii. Install double sheet rock 2 apart
iii. Two vents in wall (required by code needs to be done before school opens)
33. Boys toilet (by bridge)
1. Clean or replace roof
2. Replace TP holders
3. Install a regular bathroom sink
34. Girls toilet (by cabin # 3)
1. Remove brush and sticks from area
2. Paint booth and doors
3. Replace sink
35. Smith Pavilion (Excellent shape)
1. Seal the ceiling (by the rafters)
36. Staff hotel
1. Replace rotted fascia
2. Then paint fascia
3. Repair lattice
4. Put cork board in every room
5. Paint trim in all rooms
6. Paint all rooms
7. Check and clean all dressers and nightstands
8. Curtains in social room
9. Trim around panel box
10. Finish trim work in room 7
11. Add stone dust around ramp
37. Wright Building (Excellent shape)
1. Paint interior
38. Memorial path
1. Lay pavers
2. Weed control
39. Memorial garden
1. Weed
2. Plant flowers
3. Deer repellants
40. Farnsworth Pavilion
1. Paint upper part
2. Repair electric
41. Uplinger building
1. Convert and hang heaters
2. Install drainage in front of building
42. Pool area
1. Paint building exterior and interior
2. Repair crack in cement
3. Paint cement
43. Grounds
1. Grind many stumps on the ground
Additional Jobs
1. Picking up brush around camp
2. Cut under brush and down tress between snowshoe lane and cabin #27
3. Replace driveway pipe 24 x 40 (plastic)
4. Replace 24 x 10 pipe by steps going to dining hall
5. Install rope railing on the other steps going to dining hall
6. Install privacy fence by or around maintenance building
7. Hard surface all walkways (paving or stone dust)
8. Paint building and repair roof and insulation at pump house on the hill