JOBS LIST
contact Dave Noteboom or camp office
Updated March 2010
All Buildings should be checked yearly:
a. Lights
b. Smoke alarms
c. Exit Signs
d. Fire Extinguishers
1. Cabin number 1
a. Paint porch floor and walls
b. Install larger rear exit door (36")
2. Cabin number 2
a. Install larger rear exit door (36")
3. Cabin number 3
a. Paint porch, walls and floor
b. Paint porch ceiling
c. Install drop ceiling inside
d. Paint window trim
e. Install 48" florescent lights
4. Cabin number 4
a. Replace 48" florescent lights
b. Replace roof
c. Replace steps and paint
d. Remove stump
e. Replace porch floor and paint
f. Paint interior floor
g. Replace storm door
5. Cabin number 5
a. Paint rear deck and steps
b. Paint railing, enclosure bottom of the walls, porch ceilings and floor
c. Replace roof or clean off
d. Add ceiling
e. Add (2) 48" Fluorescent lights
6. Cabin number 6 (could be used for a sleeping cabin) (8)
a. Replace front step
b. Bring ramp to code (or remove)
c. Clean roof
7. Cabin number 7
a. Paint exterior, steps and porch
b. Repair lattice
c. Clean roof
d. Replace support under rear wall near steps
e. Replace Back Steps
8. Cabin number 8
a. Paint front porch, floor and front steps
9. Cabin number 9
a. Paint steps
b. Repair screens
c. Brace screen door
d. ceiling in cabin and porch
e. Paint
10. Cabin number 10
a. Install ceiling
b. Paint steps, platform on porch and rear steps
c. Finish railing on platform
d. New roof - tin brown
11. Cabin number 11
a. Install new rear door (36")
b. Patch hole in wall
c. Repair screens
d. Paint porch floor and inside walls
e. Paint rear fascia
12. Cabin number 12
a. Install ceiling
b. Replace light fixtures
c. Paint inside walls
d. Enlarge back door (36")
13. Cabin number 13
a. Paint porch floor (Excellent shape)
14. Cabin number 14
a. Paint railings
15. Cabin number 15
a. Paint porch floor and interior walls
b. Paint rear steps and inside floor
16. Cabin number 16 (a sleeping cabin) (8)
a. Paint porch floor
b. Fascias and soffits
c. Paint front desk and railings
d. Add railing on inside of front steps
17. Cabin number 17 (a sleeping cabin) (8)
a. Install inside walls
18. Cabin number 18 (a sleeping cabin) (8)
a. Paint front porch
b. Paint the interior
19. Cabin number 19 (a sleeping cabin) (8)
a. Paint front porch and steps (excellent shape)
20. Cabin number 20 (a sleeping cabin) (8)
a. Paint porch trim
b. Foundations post area tilting
c. Install outside lamp on post
d. If ramp stays; it needs to be brought up to code
21. Cabin number 22
a. Needs some landscaping
b. Paint front and rear steps
22. Cabin number 23
a. Stain handicapped ramp
b. Paint railings
c. Paint porch floor
d. Paint front steps
23. Cabin number 24 and 25 (a sleeping cabin) (16) (Excellent shape)
a. Electric mast and guyed wire should be replaces
b. Needs outside light
24. Cabin number 26 and 27 (a sleeping cabin) (16)
a. Bathroom - complete ceiling
b. Trim work in bathroom and hallway
c. Paint bathroom
25. Chapel
a. Needs landscaping in rear
b. Spray or repair walkways
c. Install larger driveway
d. Pipe and stones
26. Drake house
a. Stain front porch
b. Remove rug (musty)
c. Landscaping
27. Hill house
a. Stain front porch
b. Check-out landscaping
28. Infirmary
a. New window in two bathrooms
b. Finish trim in handicapped bathroom
c. Install railings on back steps
d. Install two vents in boiler and hot water room
e. Paint railing on ramp
f. Stain walk way on new ramp
g. Remove one bathroom in office (turn into a storage closet)
29. McCabe Office
a. Needs more insulation
b. Extend roof over porch
c. Enclose part of deck for sitting room
30. Office containers
a. Install electric
b. Build shelves in containers
c. Paint brown (stable)
d. Possible - build roof over containers
31. Shower Building
a. Laundry room
i. Paint lattice
ii. Repair and paint ceiling
b. Boys shower
i. New door on stall
ii. Install filter on water supply
c. Girls shower
i. Install filter on showers
ii. Paint grab bar in shower
d. Boiler room
32. Boy's toilet (by bridge)
a. Clean or replace roof
b. Replace TP holders
33. Girl's toilet (by cabin # 3)
a. Remove brush and sticks from area
b. Paint booth and doors
34. Smith Pavilion (Excellent shape)
a. Paint the bathroom - white
35. Staff hotel
a. Replace rotted fascia
b. Then paint fascia
c. Repair lattice
d. Put cork board in every room
e. Paint trim in all rooms
f. Paint all rooms
g. Check and clean all dressers and nightstands
h. Curtains in social room
i. Trim around panel box
j. Finish trim work in room 7
k. Add stone dust around ramp
36. Wright Building (Excellent shape)
a. Paint interior
37. Memorial path
a. Lay pavers
b. Weed control
38. Memorial garden
a. Weed
b. Plant flowers
c. Deer repellants
39. Farnsworth Pavilion
a. Paint upper part
b. Repair electric
40. Uplinger building
a. Convert and hang heaters
41. Pool area
a. Paint cement
42. Grounds
a. Grind many stumps on the ground
43. LakeHouse
a. Paint the Hall
b. Complete the moulding in Room #3
c. Complete the railing in Room #3
d. Paint the ramp (Sable)
e. Stain the deck floor
f. Install more insulation up over Kitchen and Living Room
g. Insulate the water pipes in basement
h. Wrap the hot water tank
ADDITIONAL JOBS
1. Picking up brush around camp
2. Cut under brush and down tress between snowshoe lane and cabin #27
3. Replace driveway pipe 24' x 40' (plastic)
4. Replace 24' x 10' pipe by steps going to dining hall
5. Install rope railing on the other steps going to dining hall
6. Install privacy fence by or around maintenance building
7. Paint building and repair roof and insulation at pump house on the hill
8. Curtains for Lakehouse, Trailer and Staff
9. Fireplace repair in LakeHouse - Greenfield Lions