.
JOBS LIST

PRINT JOBS LIST                                              PRINT PROJECT LIST

JOBS AT CAMP BADGER   **  also see Projects List - larger projects  **
Lion’s Camp Badger

Cabin Job list

Updated 3/12/09

   1. All Buildings should be checked yearly
         1. Lights
         2. Smoke alarms
         3. Exit Signs

   2. Cabin number 1
         1. Paint porch floor and walls
         2. Install larger rear exit door (36”)

   3. Cabin number 2
         1. Install larger rear exit door (36”)

   4. Cabin number 3
         1. Repair screen door
         2. Replace rear steps
         3. Paint porch, walls and floor
         4. Install porch ceiling and paint
         5. Install drop ceiling inside
         6. Paint window trim
         7. Replace middle rear foundation

   5. Cabin number 4
         1. Replace 48” florescent lights
         2. Replace roof
         3. Replace steps and paint
         4. Remove stump
         5. Replace porch floor and paint
         6. Paint interior floor
         7. Replace storm door

   6. Cabin number 5
         1. Replace 48” florescent lights
         2. Install drop ceiling inside
         3. Paint rear deck and steps
         4. Paint railing, screen porch, enclosure bottom of the walls, porch ceilings  and floor
         5. Replace roof

   7. Cabin number 6 (could be used for a sleeping cabin) (8)
         1. Replace front step
         2. Bring ramp to code (or remove)
         3. Install drop ceiling
         4. Clean roof
         5. Painting throughout

   8. Cabin number 7
         1. Paint exterior, steps and porch
         2. Repair lattice
         3. Clean roof
         4. Replace support under rear wall near steps

   9. Cabin number 8
         1. Paint front porch, floor, walls and front steps

  10. Cabin number 9
         1. Paint steps
         2. Repair screens
         3. Check Triplex
         4. Repair lattice (4” off ground)
         5. Brace screen door
         6. Drop ceiling in cabin and porch
         7. Paint

  11. Cabin number 10
         1. Install drop ceiling
         2. Paint steps, platform on porch and rear steps
         3. Finish railing on platform
         4. New roof

  12. Cabin number 11
         1. Install new rear door (36”)
         2. Patch hole in wall
         3. Repair screens
         4. Paint porch floor and inside walls
         5. Paint rear fascia

  13. Cabin number 12
         1. Install drop ceiling
         2. Replace light fixtures
         3. Paint inside walls
         4. Enlarge back door (36”)

  14. Cabin number 13
         1. Paint porch floor (Excellent shape)

  15. Cabin number 14
         1. Paint interior walls
         2. Replace porch railings and paint
         3. Remove stumps by cabin

  16. Cabin number 15
         1. Paint porch floor and interior walls
         2. Paint rear steps and inside floor

  17. Cabin number 16 (a sleeping cabin) (8)
         1. Paint porch floor
         2. Fascias and soffits
         3. Paint front desk and railings
         4. Add railing on inside of front steps

  18. Cabin number 17 (a sleeping cabin) (8)
         1. Install windows
         2. Install outside walls

  19. Cabin number 18 (a sleeping cabin) (8)
         1. Paint front porch
         2. Paint back steps
         3. Paint railings on rear deck
         4. Paint the interior

  20. Cabin number 19 (a sleeping cabin) (8)
         1. Paint front porch and steps (excellent shape)

   21. Cabin number 20 (a sleeping cabin) (8)
         1. Paint porch trim
         2. Foundations post area tilting
         3. Install outside lamp on post
         4. If ramp stays; it needs to be brought up to code

  22. Cabin number 22
         1. Needs some landscaping
         2. Install drop ceiling
         3. Paint front and rear steps

  23. Cabin number 23
         1. Stain handicapped ramp
         2. Paint railings
         3. Paint porch floor
         4. Paint front steps

  24. Cabin number 24 and 25 (a sleeping cabin) (16) (Excellent shape)
         1. Electric mast and guyed wire should be replaces
         2. Needs outside light

  25. Cabin number 26 and 27 (a sleeping cabin) (16)
         1. Bathroom – complete ceiling
         2. Trim work in bathroom and hallway
         3. Paint bathroom

  26. Chapel
         1. Needs landscaping in rear
         2. Platform by rear door for handicapped exit
         3. Spray or repair walkways
         4. Install larger driveway
         5. Pipe and stones

  27. Drake house
         1. Stain front porch
         2. All outside needs painting (brown – stable)
         3. Change water supply to toilet
         4. Remove rug (musty)
         5. Landscaping

  28. Hill house
         1. Stain front porch
         2. Need electric
         3. Check-out landscaping

  29. Infirmary
         1. New roof
         2. New window in two bathrooms
         3. Finish trim in handicapped bathroom
         4. Install railings on back steps
         5. Install two vents in boiler and hot water room
         6. Paint railing on ramp
         7. Stain walk way on new ramp
         8. Remove one bathroom in office (turn into a storage closet)

  30. McCabe Office
         1. Needs more insulation
         2. Replace office window
         3. Extend roof over porch
         4. Enclose part of deck for sitting room
         5. Stain the deck

  31. Office containers
         1. Install electric
         2. Build shelves in containers
         3. Paint brown (stable)
         4. Possible – build roof over containers

  32. Shower Building
         1. Laundry room
                i.      Paint lattice
               ii.      Repair and paint ceiling
         2. Boys shower
                i.      New door on stall
               ii.      Install filter on water supply
         3. Girls shower
                 i.      Install filter on showers
                ii.      Paint grab bar in shower
         4. Boiler room
                 i.      Needs double fire wall
                 ii.      Install double sheet rock 2” apart
                iii.      Two vents in wall (required by code – needs to be done before school opens)

  33. Boy’s toilet (by bridge)
         1. Clean or replace roof
         2. Replace TP holders
         3. Install a regular bathroom sink

  34. Girl’s toilet (by cabin # 3)
         1. Remove brush and sticks from area
         2. Paint booth and doors
         3. Replace sink

  35. Smith Pavilion (Excellent shape)
         1. Seal the ceiling (by the rafters)

  36. Staff hotel
         1. Replace rotted fascia
         2. Then paint fascia
         3. Repair lattice
         4. Put cork board in every room
         5. Paint trim in all rooms
         6. Paint all rooms
         7. Check and clean all dressers and nightstands
         8. Curtains in social room
         9. Trim around panel box
        10. Finish trim work in room 7
        11. Add stone dust around ramp

  37. Wright Building (Excellent shape)
         1. Paint interior

  38. Memorial path
         1. Lay pavers
         2. Weed control

  39. Memorial garden
         1. Weed
         2. Plant flowers
         3. Deer repellants

  40. Farnsworth Pavilion
         1. Paint upper part
         2. Repair electric

  41. Uplinger building
         1. Convert and hang heaters
         2. Install drainage in front of building

  42. Pool area
         1. Paint building exterior and interior
         2. Repair crack in cement
         3. Paint cement

  43. Grounds
         1. Grind many stumps on the ground

Additional Jobs

1.     Picking up brush around camp
2.     Cut under brush and down tress between snowshoe lane and cabin #27
3.     Replace driveway pipe 24’ x 40’ (plastic)
4.     Replace 24’ x 10’ pipe by steps going to dining hall
5.     Install rope railing on the other steps going to dining hall
6.     Install privacy fence by or around maintenance building
7.     Hard surface all walkways (paving or stone dust)
8.     Paint building and repair roof and insulation at pump house on the hill

HOME
.
Our Program
Officers and Staff
.
Events/Calendar
Newsletter
..
Send your child
        Letters From Parents
.
How you can help
    Make a Donation
    Work Projects
    Jobs List
    WISH LIST
    Walk of Pride
    Our Foundation
.
Photo Album
Virtual Tour
Important Links
.
.History
Camp Stories
     A DAY AT CAMP
     MY STORY
     WRITE IDEA
.
Employment
Opportunities
.
Contact Us
.
Webmaster

HOME
.
Our Program
Officers and Staff
.
Events/Calendar
Newsletter
..
Send your child
        Letters From Parents
.
How you can help
    Make a Donation
    Work Projects
    Jobs List
    WISH LIST
    Walk of Pride
    Our Foundation
.
Photo Album
Virtual Tour
Important Links
.
.History
Camp Stories
     A DAY AT CAMP
     MY STORY
     WRITE IDEA
.
Employment
Opportunities
.
Contact Us
.
Webmaster

Lions Camp Badger
Home of the
EMPIRE STATE SPECIAL NEEDS EXPERIENCE, Inc.
"A Special Education Summer School"