.jpg)
|
PROJECT/BUILDING |
SQ.FT. |
NEEDS |
ADOPTED BY |
DIST |
|
|
|
|
|
|
|
All Buildings |
|
Check yearly: |
|
|
|
|
|
Lights |
|
|
|
|
|
Smoke alarms |
|
|
|
|
|
Exit Signs |
|
|
|
|
|
Fire Extinguishers |
|
|
|
BBQ PIT |
|
|
Newfield Lions |
E2 |
|
|
|
|
|
|
|
CABIN 01 |
255 |
Paint Porch floor and walls |
Big Flats Lions |
E2 |
|
|
|
|
|
|
|
CABIN 02 |
255 |
Install larger rear exit door (36") |
|
E2 |
|
|
|
Paint front porch |
|
|
|
|
|
|
|
|
|
CABIN 03 |
255 |
Install larger rear exit door (36") |
Odessa Lions |
E2 |
|
|
|
|
|
|
|
CABIN 04 |
265 |
Replace roof (tin) |
Owego Lions |
E2 |
|
|
|
Replace steps and paint |
|
|
|
|
|
Replace porch floor and paint |
|
|
|
|
|
Replace 48" fluorescent lights |
|
|
|
|
|
Paint interior floor |
|
|
|
|
|
Replace storm door |
|
|
|
|
|
|
|
|
|
CABIN 05 |
265 |
Replace roof (tin) |
|
|
|
|
|
Install larger rear exit door (36") |
|
|
|
|
|
Add ceiling |
|
|
|
|
|
Add 2 fluorescent lights |
|
|
|
|
|
Replace front steps |
|
|
|
|
|
Paint rear deck and steps |
|
|
|
|
|
Paint railing, enclose bottom walls, |
|
|
|
|
|
Paint porch, ceiling and floor |
|
|
|
|
|
|
|
|
|
CABIN 06 |
476 |
Paint exterior (sable) |
Wolcott Lions & Lioness |
E2 |
|
|
|
|
|
|
|
PROJECT/BUILDING |
SQ.FT. |
NEEDS |
ADOPTED BY |
DIST |
|
CABIN 07 |
255 |
Paint exterior steps & porch |
Trumansburg Lions |
E2 |
|
|
|
Repair lattice |
|
|
|
|
|
Clean roof |
|
|
|
|
|
Replace back steps |
|
|
|
|
|
|
|
|
|
CABIN 08 |
255 |
Paint front porch, floor and steps |
Big Flats Lions |
E2 |
|
|
|
|
|
|
|
CABIN 09 |
255 |
Repair screens |
|
|
|
|
|
Brace screen door |
|
|
|
|
|
ceiling on porch |
|
|
|
|
|
|
|
|
|
CABIN 10 |
255 |
Paint steps, platform on porch, rear steps |
Medina Lions |
E1 |
|
|
|
Install new roof (tin) |
|
|
|
|
|
|
|
|
|
CABIN 11 |
255 |
Repair screens |
Greenfield Lions |
Y2 |
|
|
|
Paint rear fascia |
|
|
|
|
|
|
|
|
|
CABIN 12 |
255 |
Paint exterior (sable) |
Corning Lions |
E2 |
|
|
|
|
|
|
|
CABIN 13 |
235 |
Paint porch floor |
Binghamtom Lions & |
Y1 |
|
|
|
|
Windsor Lions |
|
|
|
|
|
|
|
|
CABIN 14 |
255 |
Paint Railing |
Gates Lions |
E1 |
|
|
|
|
|
|
|
CABIN 15 |
255 |
Paint porch floor |
Gasport Lions & |
N |
|
|
|
Paint rear steps |
Newfane Lions |
N |
|
|
|
Paint interior floor |
|
|
|
|
|
|
|
|
|
CABIN 16 |
560 |
Paint porch floor |
Ovid-Willard Lions |
E2 |
|
|
|
Paint front deck and railings |
|
|
|
|
|
Add railing on inside front steps |
|
|
|
|
|
|
|
|
|
CABIN 17 |
483 |
Install inside walls |
Hamlin Lions |
E2 |
|
PROJECT/BUILDING |
SQ.FT. |
NEEDS |
ADOPTED BY |
DIST |
|
CABIN 18 |
483 |
Install windows 36" x 24" |
Mamakating Lions |
O |
|
|
|
Paint ramp |
|
|
|
|
|
|
|
|
|
CABIN 19 |
483 |
Paint front porch |
Tioga Nichols Lions |
E2 |
|
|
|
Paint ramp |
|
|
|
|
|
Install railing |
|
|
|
|
|
|
|
|
|
CABIN 20 |
483 |
Install new roof (tin) |
Hilton Lions |
E1 |
|
|
|
Paint porch trim |
|
|
|
|
|
Install outside light on pole |
|
|
|
|
|
Paint outside cabin |
|
|
|
|
|
|
|
|
|
CABIN 21 |
|
Tear down cabin |
|
|
|
|
|
|
|
|
|
CABIN 22 |
483 |
Paint front & rear steps |
Spencer Candor Lions |
E2 |
|
|
|
Complete the electric |
|
|
|
|
|
Landscaping |
|
|
|
|
|
|
|
|
|
CABIN 23 |
483 |
Stain handicapped ramp |
Hamilton Lions |
Y1 |
|
|
|
Paint railings |
|
|
|
|
|
Paint porch floor& steps |
|
|
|
|
|
|
|
|
|
CABIN 24/25 |
560 x 2 |
Replace electric mast/guy wire |
Elmira Lions |
E2 |
|
|
|
Install outside light (auto on/off) |
|
|
|
|
|
|
|
|
|
CABIN 26/27 |
560 x 2 |
Install lattice on door |
Town of Niagara Lions |
N |
|
|
|
Repair screen door |
|
|
|
|
|
Repair outside light |
|
|
|
|
|
Install trimwork in bathroom |
|
|
|
|
|
|
|
|
|
CHAPEL |
1213 |
Install new roof, one side |
|
|
|
|
|
Install lattice around deck |
|
|
|
|
|
Paint/stain deck |
|
|
|
PROJECT/BUILDING |
SQ.FT. |
NEEDS |
ADOPTED BY |
DIST |
|
CHAPEL (cont'd) |
|
Trim brush on bank |
|
|
|
|
|
Maintain flower bed & garden |
|
|
|
|
|
|
|
|
|
COLLINS/CONROY |
4900 |
Install new roof (tin) |
District 20-E1 |
E1 |
|
LODGE |
|
Insulate and sheetrock serving area |
|
|
|
|
|
Install drop ceiling in serving area |
|
|
|
|
|
Install new lights in serving area |
|
|
|
|
|
Build room around water system |
|
|
|
|
|
Purchase new or used Ice Machine |
|
|
|
|
|
|
|
|
|
DRAKE HOUSE |
576 |
Stain Front porch |
Watkins Montour Lions |
E2 |
|
|
|
Remove old carpets |
|
|
|
|
|
Landscape behind bulding |
|
|
|
|
|
|
|
|
|
FARNSWORTH Pav. |
|
|
North Rose Lions |
E2 |
|
|
|
|
|
|
|
GALLUP MEMORIAL |
|
|
Newfield Lions |
E2 |
|
|
|
|
|
|
|
HILL HOUSE |
724 |
Stain front porch |
Rheinbeck Lions |
O |
|
|
|
Paint interior |
|
|
|
|
|
|
|
|
|
INFIRMARY |
1293 |
Install new window in bathroom |
Avon Lions |
E1 |
|
|
|
Install railing on back steps |
|
|
|
|
|
Install trimwork in handicap bathroom |
|
|
|
|
|
Paint railing on ramp |
|
|
|
|
|
Stain walkway on ramp |
|
|
|
|
|
Remove one bathroom (storage room) |
|
|
|
|
|
|
|
|
|
LAKE FRONT |
|
|
E Aurora Lioness |
O |
|
DOCKS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PROJECT/BUILDING |
SQ.FT. |
NEEDS |
ADOPTED BY |
DIST |
|
LAKE HOUSE |
2700 |
Install new roof (tin) |
|
|
|
|
|
Install new Boiler |
|
|
|
|
|
Paint hallway |
|
|
|
|
|
Paint Ramp (sable) |
|
|
|
|
|
Install insulation, insulate water pipes |
|
|
|
BEDROOMS 1 & 2 |
|
|
Greece Ridge Lions |
E1 |
|
BEDROOM 3 |
|
complete room #3 |
|
|
|
BEDROOM 4 |
|
|
|
|
|
BEDROOM 5 |
|
|
|
|
|
DINING ROOM |
|
|
|
|
|
KITCHEN |
|
|
|
|
|
LIVING ROOM (original) |
|
|
|
|
|
BOARD ROOM |
|
|
|
|
|
|
|
|
|
|
|
MAINTENANCE BLDG |
|
|
|
|
|
|
|
|
|
|
|
MCCABE OFFICE |
1200 |
Extend roof over porch |
|
|
|
|
|
Insulate under crawl space |
|
|
|
Storage Containers |
320 |
Install electricity |
|
|
|
|
|
Paint exterior (sable) |
|
|
|
|
|
Build roof over containers |
|
|
|
|
|
|
|
|
|
MEMORIAL PATH/GARDEN |
|
|
|
|
|
|
|
|
|
|
|
PLAYGROUND |
|
|
Lancaster LEOS |
N |
|
|
|
|
|
|
|
POOL AREA |
|
|
|
|
|
POOL |
|
|
District 20-Y1 |
Y1 |
|
PUMP HOUSE |
|
|
|
|
|
REST ROOMS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PROJECT/BUILDING |
SQ.FT. |
NEEDS |
ADOPTED BY |
DIST |
|
SHOWERS |
|
Install new roof |
|
|
|
BOYS |
|
New door on stall, install water filter, |
Geneva Lions |
E2 |
|
|
|
Install three new faucets in showers |
|
|
|
GIRLS |
|
|
Geneva Lions |
E2 |
|
LAUNDRY ROOM |
|
Paint lattice, Repair & paint ceiling |
|
|
|
|
|
|
|
|
|
SMITH PAVILION |
2700 |
Install garage doors |
Apalachin Lions |
E2 |
|
|
|
|
|
|
|
STAFF HOTEL |
2772 |
Replace rotten fascia |
Heuvelton Lions |
W |
|
|
|
Paint fascia |
|
|
|
|
|
Repair lattice |
|
|
|
|
|
Paint 3 rooms plus trim |
|
|
|
|
|
new curtains in social area |
|
|
|
|
|
trim around panel box |
|
|
|
|
|
finish handicap accessible room |
|
|
|
|
|
paint railing, stain deck |
|
|
|
|
|
|
|
|
|
TRAILER |
730 |
Repair or replace skirting |
|
|
|
|
|
Install new pipe for septic |
|
|
|
|
|
Paint porch and wrought iron |
|
|
|
|
|
|
|
|
|
TOILET, BOYS - |
|
Clean or replace roof (tin) |
|
|
|
NEAR BRIDGE |
|
Replace toilet paper holders |
|
|
|
|
|
|
|
|
|
TOILET, GIRLS - |
|
Remove brush & sticks from area |
|
|
|
NEAR CABIN 22 |
|
Paint stalls & doors |
|
|
|
|
|
|
|
|
|
UPLINGER |
3080 |
Install heater |
Churchville Lions |
E1 |
|
|
|
Seal concrete floor |
|
|
|
|
|
Install cabinet over hot water tank |
|
|
|
|
|
Repair water leak on mast |
|
|
|
|
|
|
|
|
|
WRIGHT |
1280 |
Paint interior |
Rushville Lions |
E2 |