WISH LIST

These items are given throughout the year and needs can change daily as it gets closer to when camp is in session. Please call or Email the camp office before obtaining items on this list.
Print List
Lions Camp Badger
Home of the
EMPIRE STATE SPECIAL NEEDS EXPERIENCE, Inc.
"A Very Special Camping Experience"

HOME
.
Our Program
Officers and Staff
.
Events/Calendar
Newsletter
..
Send your child
     Application
        Letters From Parents
.
SUPPORT
    Make a Donation
    Projects List
    Wish List
    Walk of Pride
    Our Foundation
.
Photo Album
Virtual Tour
Important Links
.
.History
Camp Stories
     A DAY AT CAMP
     MY STORY
     WRITE IDEA
.
Employment
Opportunities
.
Contact Us
.
Webmaster

                                           Wish List  2012


Please call the office or e-mail in regards to this wish list as it constantly changes.
Maintenance supplies
1.        Large wood chipper (for brush)
2.        Leaf blower (gas)
3.        16 gallon shop vacuum (6.5 horsepower)
4.        A high capacity blower (for blowing out lines in pool)
5.        R.V. Antifreeze (We use a bout 100 gallons a year)
6.        Motor oil (10 w - 40 and low 40 S -3 (for diesel))
7.        Tandem wheel trailer dump (5000 capacity)
8.        New golf cart / Gasoline
9.        Snow plow to fit 2007- Ford Pick-up
General Supplies
1.        2 or 3 cases of regular toilet paper
2.        2 cases toilet bowl cleaner
3.        1 case oven and stove cleaner
4.        2 or 3 cases of single fold paper towels
5.        1 case of air fresheners
6.        2 cases of regular Clorox Laundry
1.        Pillows
2.        Cotton blankets
3.        Fitted sheets (college bed size or stretcha ble)
4.        Wash cloths
Kitchen
1.        Commercial Oven Mitts
2.        10-12 lightweight plastic folding ta bles(6 ft length) Grounds
1.        Flowers for spring planting around Camp, Chapel and camp signs
2.        Potted flowers
3.        20 tons of gravel for driveway
MISCELLANEOUS JOBS A ROUND CAMP
1.        Picking up brush around camp
2.        Cut under brush and down trees between snowshoe lane and ca bin #27
3.        Replace driveway pipe 24' x 40' (plastic)
4.        Replace 24' x 10' pipe by steps going to dining hall
5.        Install rope railing on the other steps going to dining hall
6.        Install privacy fence by or around maintenance building
7.        Paint building and repair roof and insulation at pump house on the hill
8.        Curtains for Lakehouse, Trailer and Staff
9.        Fireplace repair in LakeHouse
10.        Grind stumps
11.        Install Guy wires (from tree stumps)
12.        Install poles for electric wire
13.        Create ditch a bove parking lot to control water run-off
Capital Improvements (2011/2012)
1.        Roof Replacement
a.        Lakehouse        $6,000.00
b.        Chapel (one side)        $5,000.00
c.        Staff Hotel        $15,000.00
d.        Main Bathroom/shower house        $18,000.00
e.        Cabin #3        $1,200.00
f.        Cabin #4        $1,200.00
g.        Cabin #10        $1,200.00
2.        Foundations
a.        Staff Hotel (year round-apply for grant)        $150,000.00
b.        Infirmary        $4,000.00
3.        Pond
a.        Repair the water gate        $1,500.00
b.        Remove sediment (3' to 4' deep)
4.        Electric
a.        Install New anchors for guy wire        $3,000.00
5.        Lakehouse
a.        Renovate two rooms upstairs or into a 4- bedroom dormer
b.        Install Fire Escape (Town of Dan by code)
6.        Water
a.        Insulate the pump house
b.        Bury the water line to storage tank
c.        Insulate the storage tank
d.        Bury the water line to the Dining Hall
7.        Lodge
a.        Build and Insulate attic space around water system
8.        Swimming Pool
a.        Replace Main Drain        $4,000.00
b.        New Chemtrol        $2,500.00