DINING HALL (Adopted by District E1 for 3 years)(new construction on existing structure) Includes the following items: Insulate and cover slanted roof in dining area, Insulate and cover walls, replace stacking convection ovens, repair and clean kitchen floor, gutters and down spouts on NE roofs, stain exterior walls, install metal roof and insulation on all of building
SHOWERS NEAR THE PLAYGROUND (new construction to existing structure)
Addition of building for 4 shower stalls for use by off duty staff and students. This will include excavation, concrete, plumbing, a water heater, lighting, etc.
NEW INFIRMARY (new construction)
Avon Lions Club has expressed interest in doing this project. It will include it's own well. Estimate $140,000.
STAFF HOTEL (new construction to existing structure)
Install a new foundation and cellar, heating and air conditioning system and well. Estimate $70,000
LAKE HOUSE (repairs and new construction on existing structure)
Roof replacement on old section, refurbish upstairs room for sleeping, add two dormers, add a door and stairs for exit.
Add additional insulation in ceiling over bedrooms.
Separate water lines that run to the office and Smith pavilion. Provide shutoff valves for each.
CHAPEL ( necessary maintainence)
Roof on south side needs repair. It appears that the shingles were not installed properly as many of them are coming loose and falling off. There have not been any leaks yet, due to the steepness of the roof, but attention to this problem will need to be addressed soon.
Raise the rear platform to sill height and add crushed stone around the platform.
CAMP OFFICE (improvements and new construction on existing structure)
Rebuild front porch into closed and insulated room to increase office space, add insulation in attic, re-route heat ducts, improve water supply from Lake House, replace old windows.
CAMPING AREA (new area)(Greenfield Lions)
A new camping area across the creek from Uplinger. Reason? Closer to sanitary facilities than the old one and better security. One tent platform has been installed.
AREA LIGHTING (improvements)
Several area lights have been added, but for the blind/visually impaired program, more need to be installed.
ELECTRIC SYSTEM (improvements)
New guy wire anchors are needed to support the system. There are several guy wires that are attached to trees that are rotten.
UPGRADE PLAYGROUND (improvements)
New equipment, leveling what is there, covering the area with cushioning material. Ex. www.fun-zone.computer, www.gametime.com, www.playlsi.com, www.detailedplay.com (reasonable prices)
There is a proposal from Gametime for new equipment and ground cover. If it is accepted, money donations will be needed because installation is included.
Add ADA compliant pathway to the playground.
SWIMMING POOL AREA
Install a solar pool heater. www.TheEnergySuperMarket.com, www.intheswim.com. www.recsupply.com Add ADA compliant lift for wheelchair access. Make doorways compliant with signs.
Construct a miniature golf course. Ex. www.lommagolf.com (new)(Lions Camp Badger Foundation)
Construct a low element rope course. Ex. www.grip101.com (new)
Add a Rock. Ex. www.playlsi.com (new)